Project Details

Canada Post New Mail Sorting Facility

Product Image
Location: Winnipeg, Manitoba
Lead Engineer: Nova 3 Consultants Ltd.
Products Sold: Air Handling Units, Chillers, Variable Frequency Drives, High Efficiency Heat Recovery Ventilators,Cooling Towers, Pumps, Heat Exchangers, Humidifiers, Reheat Coils,Wall Fin Radiation,VAV's, Air Curtains, Intake Ventilators, Fan Coils, Packaged Terminal Air Conditioners, Cabinet Unit Heaters, Unit Heaters,  Filters
Project Information:

This new 26,000 m2 (280,000 sq. ft.) facility is home to the latest technology in mail sorting for the Canadian postal service. Construction costs for this LEED facility were in excess of $100 million dollars. The building’s HVAC equipment includes state of the art McQuay magnetic bearing chiller technology and the building ventilation and make-up air is provided with Tempeff dual core heat recovery units with efficiencies of approximately 90%.